Fuel cost and carbon emissions saved in Narre Warren

Case Studies

McConnell Dowell continues to make strides in sustainable construction practices by utilising Black Stump Technologies' Solarators®. In Narre Warren, our Solarator® Compact 4 replaced a 30kVa diesel unit which led to more than 77,000 kgs of carbon emissions avoided annually. They also saved more than $57,000 in fuel costs and an additional $20,000 saved in diesel servicing expenses per annum. At this rate, the expected payback period for the Compact 4 unit is 2 years. 

To know more about our full product range of energy and cold chain solutions, download this brochure

Image
C4 in NWC
MCD C4 slideshow 01
Image
C4 in NWC
MCD C4 slideshow 02
Image
C4 in NWC
MCD C4 slideshow 03
Image
C4 in NWC
MCD C4 slideshow 04