Solarator® Compact 4 delivering results for Transport for NSW

Case Studies

The Solarator® Compact 4 has been instrumental in reducing emissions and fuel costs for Transport for NSW since its deployment in September 2023 at Ourimbah, New South Wales. To date, TfNSW will save $100,000 annually on fuel costs and reduce 135,000 kgs of carbon emissions annually. The project’s expected payback period using current configurations will be 1.6 years. This robust and mobile custom 10ft ISO container can be deployed in space-restricted and remote locations that need either full or partial off-grid power generation.​

For more information on our full range of mobile, modular, and rapidly deployable energy and cold chain solutions, download this brochure now.

Image
C4
Transport for NSW slideshow 01
Image
C4
Transport for NSW slideshow 02
Image
C4
Transport for NSW slideshow 03